The Hidden Costs That Kill Construction Budgets

and how to avoid them

One of the most common topics we have with clients starts with a simple question: “Why do projects always cost more than expected?”

More often than not, most projects don’t go over budget because of one major mistake. More often, it’s a series of smaller issues that weren’t identified early enough. By the time they’re discovered, the project is already underway, and the options become limited.

Sometimes there are genuine unexpected costs that could not have been anticipated. Hence, we always recommend our clients to allow for a 5 to 10% contingency, especially if the works affect an existing building.

However, over the years, we’ve seen the same challenges appear time and time again, whether it’s a commercial refurbishment, an office fit-out or a new-build development.

Ground conditions are a good example. A site can appear straightforward on paper, but until investigations have been carried out, nobody really knows what’s happening beneath the surface and what could come up once the works commence.

Many issues can be hidden below: poor soil, unexpected foundations, contamination or drainage issues can all have a significant impact on construction costs. These aren’t the most exciting parts of a project, but they’re often the things that end up affecting the budget the most.

Likewise, utilities can cause similar problems. Existing services don’t always sit where you expect them to; in fact, they rarely do. Discovering a major electricity supply, drainage run or telecoms connection in the middle of a proposed building footprint can trigger redesign work, delays and additional costs. By the time a contractor uncovers the issue on site, it’s usually far more expensive to resolve than if it had been identified during the design stage. How do you prevent this at the design stage? Soil investigation, topographical and services surveys, drainage consultancy or sometimes even just consulting the O&M manual, if the existing building has one.

Planning permission is another area where clients can be caught out. Securing consent is obviously a major milestone, but it’s not always the end of the planning process. Every planning application will have conditions attached. If one is lucky, the conditions are quite straightforward and do not require discharging. Conditions attached to approvals often require further reports, surveys or technical information before work can begin. The worst that can happen, is having pre-commencement conditions with your planning permission. These usually require time and money to discharge, but even worse, they can cause delays to the start date. 

We have seen projects delayed by ecology reports, drainage requirements and materials approvals that weren’t fully budgeted for at the outset, and other projects where the works had to stall for months while the information was gathered and submitted. How do one overcome this? This is difficult to anticipate, as the demands of the local authority vary, depending on the officer allocated, the area and the project. The best mitigation is addressing the conditions as early as possible, appointing reliable consultants who can address the issue in the most effective ways.

One of the biggest cost risks, however, is design change. Understandably, ideas evolve as a project develops. The difficulty is that changes become progressively more expensive as construction progresses. Moving a wall on a drawing is relatively simple, even though some knock-on effects are inevitable. Moving it after services have been installed and finishes have been ordered is a very different story. We advise design freeze once the planning permission is in place, and encourage all our clients to challenge decisions and finalise them as early as possible.

This is one of the reasons we place so much emphasis on developing the design properly before construction starts. Spending more time at the front end of a project often saves both time and money later on.

Building regulations can also have a bigger impact than many people expect, particularly when working with existing buildings. A client may be planning what seems like a relatively straightforward refurbishment, only to discover that fire safety, accessibility or energy performance upgrades are required as part of the wider works. Also, consequential improvements might be triggered by small changes in an existing building, so the client is required to address items completely outside the scope of works. These requirements are entirely reasonable, but they can affect both programme and budget if they’re not considered early.

The final issue is usually not a technical one at all. It’s optimism.

At the start of any project, everybody hopes things will go exactly to plan. Sometimes they do. More often, there are unexpected challenges along the way. That’s why contingency allowances exist. A sensible contingency isn’t an admission that something will go wrong. It’s simply recognition that construction projects involve a large number of moving parts and some degree of uncertainty.

The projects that achieve the best outcomes are rarely those with the lowest initial budgets. They’re usually the ones where enough time has been invested upfront to understand the risks, coordinate the design and make informed decisions before work starts on site.

How can we help avoid extra costs?

A large part of our role is helping clients identify those risks early. You don’t just pay for our drawings, you are buying our expertise and support, which can save you thousands of pounds. Nobody can remove every uncertainty from a construction project, but careful planning and good technical information can significantly reduce the likelihood of costly surprises later.

At Axis Architecture, we have everything we need at our Hampshire-based practice to fully support you on your next architectural design project. This includes the understanding of what consultants will improve your chances of success, the planning expertise, the design skills and a large pool of experience in similar projects. If you’d like to learn more about the process, please get in touch. We work with clients locally in Hampshire and around the UK.